Previous Projects

  • Total Earthworks and Plumbing Package at Belfree Drive Greenfields

    Client: Dellavale Pty Ltd
    Installation of Plumbing to Office blocks, Fire service, stormwater, site works, bitumen preparation, concrete kerbs, plinths.
  • Stormwater and Plumbing works Cavan for Data Bank and White wires.

    Client: Commercial and General Pty Ltd
    Installation of total Plumbing to Offices, sewer pumping station, stormwater, FRC pipework and cut into council drain.
  • Installation of total Plumbing and Stormwater package for Cameron Transport at Tappa Rd Edinburgh Park.

    Client: Commercial and General Pty Ltd.
  • Installation Stormwater to multi storey car park: Golders Pty Ltd. Cnr Flinders & Tanem St Adelaide

    Client: Commercial and General Pty Ltd
    Installation of Stormwater pumping station, plumbing to offices and amenities, headwalls, Storm Pro & P.V.C. pipe work, P.V.C Downpipes, Sump construction and installation of channel grates site preparation for concrete and bitumen works.
  • Noarlunga Downs: Noarlunga Retirement Village Land Sub Division Stages 1,2 &4

    Client: Build-tec Group
    Sewer, Water and Fire Mains connections detailed Sump and Manhole construction, Benching and common service trenching.
  • Total Plumbing and Stormwater package. Housing SA

    Client: Build-tec Group
    Installation of plumbing package for 10 dwellings, Sewer, Water & Fire mains for road works, including Black Max , R.C.P & P.V.C. pipe work, Stormwater and above ground rainwater tanks and base preparation to roadways and compaction.
  • Total Plumbing and Stormwater package Findon Nation 42 Apartments.

    Client: Build-tec Group
    Installation of Sewer, Water, Fire, services, Stormwater, 5x 22,000 litre underground rainwater tanks & 1x 90,000 litre Aus drain detention tank, site preparation.
  • Dudley Park: Spotless Head Quarters

    Client: Build-tec Group
    Installation of total plumbing package including Fire Mains Hydrant set up, Water & Gas Mains & Stormwater package.
  • Stormwater Package: Cnr Main North Rd & Maxwell Rd. Q&R Transport

    Client: Build-tec Group
    Installation of Stormwater package including P.V.C & R.C.P. pipe work, sumps including detailed excavations, large detailed headwall construction 100,000 litre swale and earthworks.
  • Mawson Lakes: Cnr Elders Smith Drive and Salisbury Highway.

    Client: Build-tec Group
    Infrastructure package for 25 townhouses including Water, Sewer connections, Reclaimed water pipe work, P.V.C. Stormwater to site including Sumps and Grates.
  • Adelaide Entertainment Centre:

    Client: Ahrens
    Stormwater package includes diversion of Stormwater main @ 3 metres depth, connection of car park water form symphonic systems with 2x 15,000 litre pre-cast storage tanks, cut into R.C.P. pipe work, new connections and installations of gross pollutant trap to 750mm mains, sump construction, grates, preparation & installation of bitumen to trenches.
  • Edinburgh Park:

    Client: Australasian Construction Pty Ltd
    Installation of 600mm FRC pipe work, sumps, headwalls to council swale drain including installation of pipe work under Defence water main.
  • St Agnes Italian Benevolent Village Stage 1 & 2 (75 Beds)

    Client: Giocon Pty Ltd
    Installation of major Sewer, FRC Stormwater pipe work, Water, Fire & Gas mains diversion for stage 1 for split level development with Sewer manhole construction. Plumbing package including commercial grade kitchen facilities.
  • Cold Store, Innance Pty Ltd, Woodford Rd Magill

    Client: Giocon Pty Ltd
    Total Plumbing and Stormwater Package: Installation of plumbing to warehouse and office including Sewer Pumping Station, Fire Service, Stormwater, P.V.C. pipe work Sumps, Grates including 1x Ecosol Unit, Earthworks to cold store subfloor ventilation, installation of AGG Drains and pipe work, detailed backfilling with prep for concrete.
  • Lot 742 Yalumba Drive Paralowie (SAHT Neighbourhood Redevelopment)

    Client: Build- Tec Group
    Total installation of Plumbing package to – houses, rainwater, storm pro pipework sumps grates installation of fire double headed hydrant.
  • Cudmore Terrace Henley Beach townhouse

    Client: Build-Tec Group
    Total installation Plumbing, Gas & stormwater package
  • Mater Christi Parish Grange Rd Seaton

    Client: Build-Tec Group
    Total installation of plumbing, stormwater & fire protection package
  • Optos Warehouse (Lt 12 Myer Court Beverly Main Business Park)

    Client Build-Tec Group
    Total installation of Plumbing, Stormwater package
  • Firecorp Warehouse (lt 14 Myer Court Beverly Main Business Park)

    Client: Build-Tec Group
    Total installation of Plumbing package
  • DFC Housing Asset (The Avenue Athol Park)

    Client: Build-Tec Group
    Total Plumbing, Gas, Rainwater & Stormwater & crossover package
  • Italia Ceramic (Glynde Rd Glynde)

    Client: Mazzone Constructions Pty Ltd
    Total Plumbing , Gas and Fire re-works
  • Dudley Park Warehouse (lot Islington Court,)

    Client: Build-Tec Group
    Installation of plumbing, stormwater, 22,000 litre detention tank and fire service.
  • Hyundai Reynella ( Main South Rd Reynella)

    Client: Commercial & General Builders
    Total installation of Plumbing, Stormwater, Ecosol unit pits & pipework with 65meters of ACO drainage, 2x 20,000 litre Rainwater tanks, pumps, wash bay, settling pit, oil plate separator, sludge pump, gross pollutant package
  • St Clair Development (Post Parade Cheltenham) – 33 unit & 4 Retails premises

    Client: Build-Tec Group
    Total installation of plumbing, stormwater, sewer, trade waste, hot & cold reticulation, water meter installation and unit fitouts.
  • Coca Cola Warehouse (relocation) Salisbury

    Client: Commercial & General Builders
    Installation of stormwater systems with PVC pipe work, 450mm Black Max pipe work, sumps, sewer diversion 5meters deep pump station, 400meters of Fire Mains installation.
  • SA Power Network South Depot Marleston

    Client: Maxi Aire
    Installation of water, sewer, trade waste, 100mm gas main to new mechanical plant room.
  • Smiths Chips: South Rd, Regency Park

    Client: Vaughan Constructions Pty Ltd.
    Installation of stormwater system, sumps and 600mm & 300mm FRC pipework, PVC and downpipe connections, installation of Gross Pollutant trap and stormwater pump station, 700meter Fire ring main extension, Booster upgrade.
  • Beverley Warehouse Developments: 11, 14 & 15 Myer Crt Islington

    Client: Build Tec Services:
    Total installation of Plumbing, Stormwater package.
  • Siemens Workshop: Tonsley

    Client: Commercial & General Builders
    Installation of Stormwater system, office plumbing package, trade waste to wash bay, fire service installation, underground airline system.
  • AM/PM BP Petrol Station Mount Barker

    Client: Commercial & General Builders
    Installation of Stormwater system, swale drain, trench grates, plumbing package provision for 5000litre grease arrestor, 12000 septic tank, trade waste to car wash.
  • Cement Australia Osborne

    Client: Ahrens
    Installation of Fire service & Booster upgrade, plumbing package and septic tank & pump station, water mains upgrade.

Projects Gallery

Need more information?

Contact us here!